Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/NEW HYDE PARK ORTHODONTICS
Back to prospects

NEW HYDE PARK ORTHODONTICS

Queens, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
NEW HYDE PARK ORTHODONTICS
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 23, 2026
Source for Signal date (opens in new tab)
Signal count
14 saved signals, 8 in the last 90 days
Signal summary
General Construction · PROPOSE A NEW 2ND STORY VERTICAL ENLARGEMENT TO EXISTING 1-STORY WITH CELLAR; AND CONVERSION FOR A NEW COMMERCIAL OFFICE BUILDING. OBTAIN NEW C OF O.
Source for Signal summary (opens in new tab)
Address
259 W 30TH STREET 17TH FLOOR
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

14 signals
  • Oct 23, 2026
    Permit
    General Construction · PROPOSE A NEW 2ND STORY VERTICAL ENLARGEMENT TO EXISTING 1-STORY WITH CELLAR; AND CONVERSION FOR A NEW COMMERCIAL OFFICE BUILDING. OBTAIN NEW C OF O.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Mechanical Systems · Proposed Mechanical Work as per plan filed in conjunction with Alt-CO GC # Q00960111-I1.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Structural · Structural scope in conj. w/ GC # Q00966669-I1 for a new 1-story vertical enlargement over existing 1-story+cellar. Retrofit existing structural w/ new steel frames on concrete spread footing to accommodate proposed building's gravity and lateral loads.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Foundation · UNDERPINNING WORK FILED IN CONJUNCTION WITH ALT-CO JOB FOR PROPOSING 1-STORY VERTICALENLARGEMENT ON EXISTING 1-STORY COMMERCIAL USE BUILDING.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 1, 2026
    Permit
    Sign · ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING NEW HYDE PARK ORTHODONTICS WITH LOGO
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 1, 2026
    Permit
    Plumbing · Proposed Plumbing Work as per plan filed in conjunction with Alt-CO GC # Q00966669-I1.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 31, 2026
    Permit
    Sign · ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING NEW HYDE PARK ORTHODONTICS WITH LOGO
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 31, 2026
    Permit
    Sign · ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING NEW HYDE PARK ORTHODONTICS WITH LOGO
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 3, 2026
    Permit
    Structural · Structural scope in conj. w/ GC # Q00966669-I1 for a new 1-story vertical enlargement over existing 1-story+cellar. Retrofit existing structural w/ new steel frames on concrete spread footing to accommodate proposed building's gravity and lateral loads.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 21, 2026
    Permit
    Mechanical Systems · Proposed Mechanical Work as per plan filed in conjunction with Alt-CO GC # Q00960111-I1.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 20, 2026
    Permit
    Foundation · UNDERPINNING WORK FILED IN CONJUNCTION WITH ALT-CO JOB FOR PROPOSING 1-STORY VERTICALENLARGEMENT ON EXISTING 1-STORY COMMERCIAL USE BUILDING.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 20, 2026
    Permit
    Construction Fence · CONSTRUCTION FENCE AT SITE RIGHT OF WAY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 12, 2026
    Permit
    Sidewalk Shed · Installation of heavy duty sidewalk shed as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 11, 2026
    Permit
    Sprinklers · Proposed Sprinkler Work as per plan filed in conjunction with Alt-CO GC # Q00966669-I1.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)