General Construction · The Proposed project is adding this portion (146 E 62nd St.) to the existing Mellon foundation building (136-144 E 62nd St.). New Rear extension and elevator and stair bulkhead and change use.
No product keyword matched · NYC DOB building permits
Sprinklers · NEW REAR EXTENSION AND ELEVATOR AND STAIR BULKHEAD; COMBINE WITH OTHER BUILDINGS ON THE LOT AND CHANGE USE FROM RESIDENTIAL TO OFFICES. NO DWELLING UNITS IN THE BUILDING WILL BE OCCIPIED DURING CONSTRUCTION. PL and SP work here by filed.
No product keyword matched · NYC DOB building permits
Sprinklers · NEW REAR EXTENSION AND ELEVATOR AND STAIR BULKHEAD; COMBINE WITH OTHER BUILDINGS ON THE LOT AND CHANGE USE FROM RESIDENTIAL TO OFFICES. NO DWELLING UNITS IN THE BUILDING WILL BE OCCIPIED DURING CONSTRUCTION. PL and SP work here by filed.
No product keyword matched · NYC DOB building permits
Supported Scaffold · INSTALLATION OF TEMPORARY NEEDLE BEAM SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE NEEDLE BEAM SYSTEM AT THE ROOF IS ATTACHED TO T THE WALL.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE ROOF PROTECTION AT THE EAST NEIGHBOR'S ROOF.
No product keyword matched · NYC DOB building permits