General Construction · NYC HUB DEVELOPMENT CONSULTATION MEETING WITH DBC RAMI BITAR WAS HELD AND ACCEPTED 06/12/2023 UNDER ADDRESS 3649-3667 WHITE PLAINS ROAD. PROPOSE NEW 8-STY BLDG AS NON-PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS (UG # 3) AS PER PLAN. OBTAIN A NEW CO.
General Construction · NYC HUB DEVELOPMENT CONSULTATION MEETING WITH DBC RAMI BITAR WAS HELD AND ACCEPTED 06/12/2023 UNDER ADDRESS 3649-3667 WHITE PLAINS ROAD. PROPOSE NEW 8-STY BLDG AS NON-PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS (UG # 3) AS PER PLAN. OBTAIN A NEW CO.
No product keyword matched · NYC DOB building permits
Support of Excavation · Propose SOE for retaining wall as per plan filing in conjunction with FO application. No change in use, egress or occupancy is proposed under this application.
No product keyword matched · NYC DOB building permits
General Construction · NYC HUB DEVELOPMENT CONSULTATION MEETING WITH DBC RAMI BITAR WAS HELD AND ACCEPTED 06/12/2023 UNDER ADDRESS 3649-3667 WHITE PLAINS ROAD. PROPOSE NEW 8-STY BLDG AS NON-PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS (UG # 3) AS PER PLAN. OBTAIN A NEW CO.
No product keyword matched · NYC DOB building permits
Plumbing · A STORMWATER MANAGMENT SYSTEM IS PROPOSED FOR NB # X00902721-I1. THE SYSTEM IS COMPRISED OF ROOF DETENTION, SUBSURFACE PIPING, CATCHBASINS, AREA DRAINS, PLANTER DRAINS, AND A SUB-SURFACE DETENTION SYSTEM AND CONTROLFLOW ORIFICE.
No product keyword matched · NYC DOB building permits
Plumbing · Propose Plumbing Work, consist of a new sanitary, storm, domestic water, sanitary vent, and natural gas piping systems throughout a new 8 story R-2 building filed in conjunction with NB # X00902721-I1.
No product keyword matched · NYC DOB building permits