Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/DYNAMIC PLBG & SPRKLR COR
Back to prospects

DYNAMIC PLBG & SPRKLR COR

Queens, BRONX, Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 8 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness2 / 5Latest signal is within 270 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
DYNAMIC PLBG & SPRKLR COR
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
May 15, 2026
Source for Signal date (opens in new tab)
Signal count
28 saved signals, 0 in the last 90 days
Signal summary
Plumbing · application filing plumbing work type in conjunction with alt-1 job#Q00768734 as per plan. no change of use, egress and occupancy under this application.
Source for Signal summary (opens in new tab)
Address
31-70 COLLEGE POINT BLVD
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

28 signals
  • May 15, 2026
    Permit
    Plumbing · application filing plumbing work type in conjunction with alt-1 job#Q00768734 as per plan. no change of use, egress and occupancy under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 14, 2026
    Permit
    Plumbing · CAP AND REMOVE KITCHEN SINK AND STOVE AT 1ST FLOOR, LEGALIZE 3 PIECE BATHROOM AT CELLAR AND 1ST FLOOR TO RESOLVE VIOLATION# 39116054N, 35658671J AND 35658670H.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 30, 2026
    Permit
    Plumbing · PROPOSED PLUMBING WORK AS PER PLAN IN CONJUNCTION WITH ALT-CO JOB#Q01266280-I1.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 24, 2026
    Permit
    Plumbing · Proposed plumbing work for a existing 2 family house, in conjunction with alteration 2 application B01058266-I1. No change occupancy, use, or means of egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 17, 2026
    Permit
    Sprinklers · INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 27, 2026
    Permit
    Plumbing · Replacement of kitchen equipments and plumbing fixtures as per plan. No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 18, 2026
    Permit
    Plumbing · PROPOSED PLUMBING WORK ON OPEN SPACE IN CONJUNCTION WITH DOB ALTERNATION CO JOB #:Q01204693.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 17, 2026
    Permit
    Plumbing · PROPOSED 3 PIECE BATHROOM(1 LAVATORY, 1 TOILET, 1 SHOWER), IN CELLAR FLOOR; CAP AND REMOVE SINK AND GAS STOVE IN 2ND FLOOR AND CONNECT LEADER PIPE TO STORM PIPE /DRAIN IN FRONT YARD.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 13, 2026
    Permit
    Plumbing · HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01225622-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED HEREIN
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 12, 2026
    Permit
    Plumbing · DUE TO NEW OWNER INSTALL NEW BATHROOM AT 1ST & 2ND FLOOR ,RELOCATING KITCHEN,CHANGE OF BOILER OIL TO GAS & REPLACE ALL PLUMBINGFIXTURE, CONJUNCTION WITH GC JOB B01327519-I1
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 12, 2026
    Permit
    Plumbing · PROPOSED PLUMBING WORK FROM CELLAR TO 4TH FLOOR & ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB #B01038958-I1.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. PROPOSED AUTOMATIC SPRINKLER SYSTEM AS PER PLAN.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 11, 2026
    Permit
    Plumbing · PROPOSED PLUMBING WORK ON CELLAR FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #:B01337560-I1.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    Plumbing · Q01317145as per plans, filed in conjunction with ALT CO app# Q01307010.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 17, 2026
    Permit
    Plumbing · INSTALLATION OF NEW DOMESTIC HOT WATER UPGRADES IN CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 6, 2026
    Permit
    Plumbing · Proposed plumbing work for a restaurant on 1st floor.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 21, 2026
    Permit
    Plumbing · PROPOSED RENOVATION AT CELLAR, 1ST, 2ND, & 3RD FLOOR. PLUMBING WORKS AS PER PLAN. UTILITY REQUIRED FOR GAS TEST. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 21, 2026
    Permit
    Plumbing · PROPOSED PLUMBING WORK FOR A SINGLE FAMILY BUILDING. WORK AT OPEN SPACE, CELLAR, BASEMENT, 1st TO 4th FLOOR, AND ROOF. AS PER PLAN. IN CONJUNCTION WITH DOB NOW JOB#: B01278030-I1.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 6, 2026
    Permit
    Plumbing · TO RESPOND THE VIOLATION# 35656299N. WORK WILL INCLUDE CAPE AND REMOVE 1 STOVE AND 1 TUB FROM CELLAR. REPLACING PL FIXTURES WITH NEW AT 1ST AND 2ND FLR.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 6, 2026
    Permit
    Plumbing · INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING THROUGHOUT 2 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 6, 2026
    Permit
    Plumbing · PROPOSED INTERIOR RENOVATION ON CEL. & 1ST FLOOR. PLUMBING & GAS WORKS AS PER PLAN.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)