Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Douglas Elliman Property Management
Back to prospects

Douglas Elliman Property Management

Manhattan, Queens, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Douglas Elliman Property Management
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 10, 2026
Source for Signal date (opens in new tab)
Signal count
234 saved signals, 56 in the last 90 days
Signal summary
Plumbing · General plumbing interior renovation work in Apt 4P on 4th floor to include the relocation of plumbing lines for a new bathroom and new kitchen. Cap and abandon all existing gas lines. Install new domestic water, sanitary piping, and new plumbing fixture
Source for Signal summary (opens in new tab)
Address
4749 31st Place
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

234 signals
  • Nov 10, 2026
    Permit
    Plumbing · General plumbing interior renovation work in Apt 4P on 4th floor to include the relocation of plumbing lines for a new bathroom and new kitchen. Cap and abandon all existing gas lines. Install new domestic water, sanitary piping, and new plumbing fixture
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 6, 2026
    Permit
    Mechanical Systems · HVAC installation of apartment 15B. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 5, 2026
    Permit
    General Construction · APARTMENT RENOVATION
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 5, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 4, 2026
    Permit
    Suspended Scaffold · FACADE RESTORATION, INSPECTIONS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 4, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 27, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 27, 2026
    Permit
    Plumbing · REPLACE THREE FIXTURE BATHROOM AND SINK, DISHWASHER AND STOVE IN KITCHEN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 27, 2026
    Permit
    General Construction · INTERIOR RENOVATION OF APARTMENT 3S. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 26, 2026
    Permit
    General Construction · Interior refurbishment, remodel existing floor finish, replace bathroom fixtures and finishes, replace kitchen finishes & upgrade lighting fixtures.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 26, 2026
    Permit
    General Construction · The interior renovation and HVAC installation of apartment 15B. Work includes removal of non-load bearing partitions and toilets. Installation of new doors and partitions and bedroom reconfiguration. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 23, 2026
    Permit
    Plumbing · Remove and install plumbing fixtures as per drawings filed herewith. No change to occupancy, use or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    Mechanical Systems · Scope includes installation of new split HVAC units(heat pump type), new low-pressure ductwork and accessories as per plans. No change to occupancy, use or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    General Construction · GENERAL CONSTRUCTION CREATING PRIVATE VESTIBULE SERVING ONLY UNITS APT 19A & 19L AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    General Construction · This application is being filed for general construction work to renovate the interior of an existing apartment unit as per plans. No change to existing occupancy, use, or means of egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 19, 2026
    Permit
    General Construction · HEREBY FILING FOR RENOVATION OF APT #16E. NO CHANGE IN USE , OCCUPANCY OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 19, 2026
    Permit
    Boiler Equipment · REPLACEMENT (1) NEW LOW PRESSURE BOILER. REPLACEMENT (1) NEW COMBINATION OIL/GAS BURNER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)