Structural · Remove and replace load bearing partitions, concrete slabs, sister joists and removal of dumbwaiter masonry shaft as part of tenant-in-place moderate rehabilitation. No change in egress use or occupancy.
Structural · Remove and replace load bearing partitions, concrete slabs, sister joists and removal of dumbwaiter masonry shaft as part of tenant-in-place moderate rehabilitation. No change in egress use or occupancy.
No product keyword matched · NYC DOB building permits
Sprinklers · Filing to modify existing Automatic Sprinkler. Sprinkler system is designed as per NFPA13 as modified by NYC BC appendix Q Scope is only for Commercial & office Building North Cafeteria on 2nd and 8th floor only. No change in use, occupancy or egress.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Scope of work includes the installation of the following HVAC work. Including using existing unit and Modify the air distribution system for the space. Replacing the existing hot water Radiators. No change in use, occupancy, or egress.
No product keyword matched · NYC DOB building permits
General Construction · Herewith filing interior renovation of 2nd floor existing dining area and new partitions for office spaces on 8th floor as per plans. No change in use, occupancy or egress proposed.
No product keyword matched · NYC DOB building permits
General Construction · Interior renovation of existing bathrooms and sleeping areas on floor 3 through 9. No change in use , occupancy or egress proposed.
No product keyword matched · NYC DOB building permits