Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/HAPPIER
Back to prospects

HAPPIER

Manhattan, BROOKLYN, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
HAPPIER
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 15, 2026
Source for Signal date (opens in new tab)
Signal count
29 saved signals, 3 in the last 90 days
Signal summary
General Construction · ALT2 FILED HEREWITH FOR 11TH FLOOR INTERIOR ALTERATION. SCOPE TO INCLUDE NEW INTERIOR PARTITIONS, LIGHTING AND REPLACEMENT OF EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Source for Signal summary (opens in new tab)
Address
53-75 65 PLACE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

29 signals
  • Oct 15, 2026
    Permit
    General Construction · ALT2 FILED HEREWITH FOR 11TH FLOOR INTERIOR ALTERATION. SCOPE TO INCLUDE NEW INTERIOR PARTITIONS, LIGHTING AND REPLACEMENT OF EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 15, 2026
    Permit
    General Construction · Front facade restoration and repairs. No change to use, egress, or occupancy under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 3, 2026
    Permit
    General Construction · General Construction taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 20, 2026
    Permit
    General Construction · Proposed interior renovation to a two story + basement residential use building.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 12, 2026
    Permit
    Structural · Structural work per approved plans, no changes to egress, use, & occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 11, 2026
    Permit
    Structural · STRUCTURAL WORK FOR REMOVAL OF FEW STEEL BEAMS AND INSTALLATION OF NEW STEEL FRAMING, NEW FLOOR OPNGS. AND REINFORCEMENT OF EXISTING STEEL FRAMING OF THE 5TH, 27TH, 28TH, 29TH & 30TH FLOORS OF THE EXISTING BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 16, 2026
    Permit
    Plumbing · Remove and cap the water, sanitary, and gas pipes that run from the cellar to the 3rd floor.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 15, 2026
    Permit
    Construction Fence · Construction fence
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 27, 2026
    Permit
    General Construction · INTERIOR DEMOLITION AND INTERIOR PARTITIONS RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 25, 2026
    Permit
    Standpipe · Temporary Dry Standpipe System as shown per plan. No change in use, egress of occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 18, 2026
    Permit
    Plumbing · The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floor), the existing 4 gas riser will also be reconnected, see sheet P-451 P
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 11, 2026
    Permit
    General Construction · ALT2 FILED HEREWITH FOR 8TH FLOOR INTERIOR ALTERATION. SCOPE TO INCLUDE NEW INTERIOR PARTITIONS, LIGHTING AND REPLACEMENT OF EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 11, 2026
    Permit
    Mechanical Systems · Filing to update the mechanical systems for the base building infrastructure as shown per plan. Please see comments for full description.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 9, 2026
    Permit
    Sprinklers · Modification, relocation, or addition of sprinkler heads and related piping to provide necessary coverage.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    General Construction · General Construction taking place on the (34th Floor) as per plans filed herewith. No change in Use, Egress or Occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    General Construction · General Construction taking place on the 33rd, 34th, 35th and 36th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    Mechanical Systems · Filing for Mechanical Systems modification including the removal of existing duct, piping, equipment and the installation of new duct, piping and equipment as shown per plan. No change in use, occupancy or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    General Construction · General Construction taking place on the (33rd Floor) as per plans filed herewith. No change in Use, Egress or Occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    General Construction · General Construction taking place on the (29th Floor) as per plans filed herewith. No change in Use, Egress or Occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    Mechanical Systems · INSTALLATION OF NEW MECHANICAL AND DUCT WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)