Plumbing · NEW 3 PIECE BATHROOM IN CELLAR AND BAR SINK TO BE CAPPED; REMOVAL OF BATHTUB AND INSTALLATION OF SHOWER ON SECOND FLOOR WITH NEW WASHER AND DRYER ON SECOND FLOOR. REMOVAL OF SHOWER AND INSTALLATION OF BATHROOM AND RELOCATION OF WC IN ATTIC FLOOR.
Plumbing · NEW 3 PIECE BATHROOM IN CELLAR AND BAR SINK TO BE CAPPED; REMOVAL OF BATHTUB AND INSTALLATION OF SHOWER ON SECOND FLOOR WITH NEW WASHER AND DRYER ON SECOND FLOOR. REMOVAL OF SHOWER AND INSTALLATION OF BATHROOM AND RELOCATION OF WC IN ATTIC FLOOR.
No product keyword matched · NYC DOB building permits
Boiler Equipment · REPLACEMENT (1) NEW LOW PRESSURE BOILER. REPLACEMENT (1) NEW GAS BURNER. STRAIGHT GAS ONLY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
No product keyword matched · NYC DOB building permits