General Construction · The OT PAA issuance incorporates all updates made after Revision 4 (Delta 3, dated 11.17.2025), including revisions to drawings, layouts, partitions, signage, finishes, dimensions, details, and lighting. Both a complete revised drawing set and individual
No product keyword matched · NYC DOB building permits
Structural · New openings in non load bearing cold form steel stud walls, 3 topping slab on 1st floor, 9 raised cold form steel raised floor on 1st floor and Infill existing cold form steel stud wall openings.
No product keyword matched · NYC DOB building permits
General Construction · Herewith filing for interior demo of existing wall, ceiling, and finishes. Remove existing duct for HVAC,& Remove existing sprinkler pipe as per the plans. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits