Plumbing · Installation of new bathroom fixtures, kitchen fixtures, roof drains, and sanitary, vent, domestic water, and storm piping distribution on the Cellar, 1-3rd Floors and Roof as per plans (Project Ruby - Buildout.)
Plumbing · Installation of new bathroom fixtures, kitchen fixtures, roof drains, and sanitary, vent, domestic water, and storm piping distribution on the Cellar, 1-3rd Floors and Roof as per plans (Project Ruby - Buildout.)
No product keyword matched · NYC DOB building permits
General Construction · Exterior repair and restoration of facade, repair wood railing, curb replacement, brick cleaning as per plans (Project Ruby - Buildout Phase.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · Filing herewith for use of mechanical means DS1 in conjunction with application #M01018955-I1. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout Phase.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Sprinklers · Install (38) new heads, (1) jockey & (1) booster pump on the Cellar, (33) heads on the 1st Floor, (25) heads on the 2nd Floor, (48) heads on the 3rd Floor and associated Sprinkler Piping (Project Ruby Buildout.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Plumbing · Installation of new bathroom fixtures, kitchen fixtures, roof drains, and sanitary, vent, domestic water, and storm piping distribution on the Cellar, 1-3rd Floors and Roof as per plans (Project Ruby - Buildout.)
No product keyword matched · NYC DOB building permits