Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/ARISTA AIR CONDITIONING C
Back to prospects

ARISTA AIR CONDITIONING C

Manhattan, Bronx, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
ARISTA AIR CONDITIONING C
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 27, 2026
Source for Signal date (opens in new tab)
Signal count
9 saved signals, 5 in the last 90 days
Signal summary
Mechanical Systems · Replace existing AC indoor units with new Mitsubishi AC indoor units and reconnect to the existing ductwork for apartment cooling. Outdoor unit work is being conducted under a separate application.
Source for Signal summary (opens in new tab)
Address
38-26 10 STREET
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

9 signals
  • Oct 27, 2026
    Permit
    Mechanical Systems · Replace existing AC indoor units with new Mitsubishi AC indoor units and reconnect to the existing ductwork for apartment cooling. Outdoor unit work is being conducted under a separate application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 8, 2026
    Permit
    Mechanical Systems · FILING FOR ADDITION OF NEW DAIKIN VRV SYSTEM WITH ROOFTOP HEAT PUMP.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 24, 2026
    Permit
    Mechanical Systems · Replacement of (1) condensing unit, (1) evaporating unit, and (1) humidifier in kind. No change to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 8, 2026
    Permit
    Mechanical Systems · Replacement of air conditioning unit on the roof. All existing ductwork to remain as is. No change in use egress and occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 20, 2026
    Permit
    Mechanical Systems · MINOR RENOVATION TO EXISTING OFFICE SUITE ON THE 16TH FLOOR. CONSTRUCT NON-BEARING INTERIOR PARTITIONS, INSTALL NEW VRF AIR CONDITIONING SYSTEM, ASSOCIATED PIPING & CONTROLS. INSTAL TWO (2) NEW CONDENSERS ON ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 25, 2026
    Permit
    Mechanical Systems · Replacement of (2) closed circuit Fluid Coolers. No change in use and occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 12, 2026
    Permit
    Mechanical Systems · HVAC Unit Replacement on the 7th floor MER. All existing ductwork to remain as is. No change in use egress and occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 9, 2026
    Permit
    Mechanical Systems · INSTALLATION OF NEW WATER SOURCED HEAT PUMP UNITS & ASSOCIATED PIPING & DUCTWORK AS PER THE DRAWINGS FILED HEREIN IN CONJUNCTION WITH GC #M01291335-I1
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 8, 2026
    Permit
    Mechanical Systems · HVAC unit replacement. No change in use egress and occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)