Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/HINES
Back to prospects

HINES

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
HINES
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 28, 2026
Source for Signal date (opens in new tab)
Signal count
49 saved signals, 7 in the last 90 days
Signal summary
Sidewalk Shed · Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Source for Signal summary (opens in new tab)
Address
104-35 205TH PLACE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

49 signals
  • Oct 28, 2026
    Permit
    Sidewalk Shed · Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    Plumbing · Provide metered domestic water to work area; install piping on the Cellar and 1st Floor as per plans (Hines - Storefront Phase 2.) No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    Sprinklers · Relocate (10) existing sprinkler heads and associated piping to accommodate lower slab height on the Cellar Level as per plans (Hines Storefront - Phase 2.) No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    Sprinklers · Modifications to the existing Sprinkler System: Relocate (1) head and install (1) new head on the 4th Floor; Relocate (3) heads and install (1) new on the 34th Floor as per plans (Morgan Stanley - ADA Restroom.) No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 29, 2026
    Permit
    Structural · Structural modifications: Recessing two bays of slab at the 1st Floor to accommodate a stair and an ADA ramp on the 1st Floor as per plans (Hines - Storefront Phase 2.) No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 24, 2026
    Permit
    Plumbing · Plumbing modifications on the 18th floor -New instantaneous water heater new water closet, lavatory, and floor drain and piping modifications.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 11, 2026
    Permit
    Structural · MINOR STRUCTURAL WORK AS PER PLANS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 13, 2026
    Permit
    General Construction · Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 7th floor as per plans (Hines - Demo, Whitebox & Stair Infill) No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 13, 2026
    Permit
    Sprinklers · Additions/ Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 13, 2026
    Permit
    General Construction · Minor interior construction, patching and repair of finishes in tenant spaces on the Cellar-9th and Roof as per plans (Hines Fire Alarm System Upgrade.) No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 13, 2026
    Permit
    General Construction · Minor demolition. Installation of new exterior storefront, windows, exterior door, interior stair and ADA access ramp on the Cellar and 1st floors as per plans (Storefront Phase 2.) No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 13, 2026
    Permit
    Mechanical Systems · Modifications to existing HVAC System: Remove, relocate and reinstall exiting ductwork and infrastructure to accommodate interior renovations on the Cellar and 1st Floor as per plans (Hines Storefront Phase 2.) No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    General Construction · Minor interior demolition, removal of interior non-load bearing partitions and finishes on the 1, 2, 5th and Roof as per plans (Hines Demo & Whitebox.) No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    Mechanical Systems · Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (Demo & Whitebox.) No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    Mechanical Systems · Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 1, 2, 5, 8, Roof as per plans (Demo & Whitebox.) No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    General Construction · Interior renovation of existing office, includes new non load bearing partitions, finishes, lighting, electrical
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    Mechanical Systems · Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 30, 2026
    Permit
    Sidewalk Shed · Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 23, 2026
    Permit
    Sprinklers · Modifications to the existing Sprinkler System: Install (1) new head on 2, 3, 5 & 15th Floors; (17) new heads on 6, 9 & 10th Floors; (18) new heads on the 12th Floor and associated sprinkler piping as per plans (Sprinkler System Upgrade.)
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)