Structural · INSTALLATION OF CONCRETE PADS FOR BESS EQUIPMENT, STEEL FRAME TO SUPPORT WATER SPRAY PIPING, AND 15 FOOT HIGH CMU PERIMETER WALL FOR ENERGY STORAGE SYSTEM.
No product keyword matched · NYC DOB building permits
Foundation · The proposed New Building (NB) is a non-accessory Energy Storage System which is less than 10,00 sq-ft. filed per DOB memo 2019-002, 2019-007, and the NYC Energy Storage Systems Zoning guide which detail how to file a ESS in NYC, all of which we follow.
No product keyword matched · NYC DOB building permits