General Construction · Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 14th floor as per plans. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Standpipe · SPRINKLER MODIFICATIONS IN CONJUNCTION WITH INTERIOR BUILDOUT AT FLOOR 45C/48M, INCLUDING INSTALL AND REMOVAL OF TEMP HEADS. STANDPIPE WORK RELATED TO INSTALLATION OF NEW FIRE HOSE CABINET CONNECTED TO EXISTING STANDPIPE RISER, AS SHOWN ON PLANS FILED
No product keyword matched · NYC DOB building permits
Sprinklers · SPRINKLER DEMO WORK INCLUDING INSTALLATION OF NEW TEMPORARY SPRINKLER LOOP AS SHOWN ON PLANS FILED HEREWITH AT 45TH FLOOR CONSTRUCTION / 48TH FLOOR MARKETING .
No product keyword matched · NYC DOB building permits
Sprinklers · SPRINKLER MODIFICATIONS IN CONJUNCTION WITH INTERIOR BUILDOUT AT FLOOR 45C/48M, INCLUDING INSTALL AND REMOVAL OF TEMP HEADS. STANDPIPE WORK RELATED TO INSTALLATION OF NEW FIRE HOSE CABINET CONNECTED TO EXISTING STANDPIPE RISER, AS SHOWN ON PLANS FILED
No product keyword matched · NYC DOB building permits
General Construction · HEREBY FILING PARTIAL 6TH FLOOR INTERIOR ALTERATIONS, CONSTRUCTION OF DEMISING WALL BETWEEN NEW TENANT AND STORAGE AND DEMOLITION OF WALL, FLOOR AND CELING TILES ON THE 2 RESTROOMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
No product keyword matched · NYC DOB building permits
Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION AT FLOOR 45C/48M, AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
No product keyword matched · NYC DOB building permits
General Construction · GENERAL CONSTRUCTION TO INCLUDE INSTALLATION OF NEW PARTITIONS, FINISHES, DOORS , CEILING AND RELATED CONSTRUCTION AS SHOWN ON PLANS FILED , AT FLOOR 45C/48M. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
No product keyword matched · NYC DOB building permits
General Construction · NON-STRUCTURAL INTERIOR DEMO ON FLOOR 48M/45C, INCLUDING REMOVAL OF INTERIOR FINISHES, CEILINGS, WALL PANELS, ELECTRICAL DEVICES, ELEVATOR CAB FINISHES, CALL BUTTONS, AND CALL LANTERNS. PATCH/REPAIR AS REQUIRED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
General Construction · Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Plumbing · PLUMBING WORK ON ASSOCIATED PIPING AT CONSTRUCTION FLOOR 13/MARKETING FLOOR 16 & CONSTRUCTION FLOOR 14/MARKETING FLOOR 17, AS SHOWN ON PLANS FILED HEREWITH
No product keyword matched · NYC DOB building permits
General Construction · GENERAL CONSTRUCTION WORK INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS AND CEILING AS INDICATED ON PLANS FILED HEREWITH, AT CONSTRUCTION FLOOR 13/MARKETIING FLOOR 16 & CONSTRUCTION FLOOR 14/ MARKETING FLOOR 17.
No product keyword matched · NYC DOB building permits
Sprinklers · SPRINKLER WORK ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH AT CONSTRUCTION FLOOR 13/MARKETING FLOOR 16 & CONSTRUCTION FLOOR 14/MARKETING FLOOR 17. INCLUDING INSTALL AND REMOVAL OF TEMPORARY CORE SPRINKLER PROTECTION.
No product keyword matched · NYC DOB building permits
Mechanical Systems · MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH, AT CONSTRUCTION FLOOR 13/MARKETIING FLOOR 16 & CONSTRUCTION FLOOR 14/MARKETING FLOOR 17. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION
No product keyword matched · NYC DOB building permits
Structural · Removal of existing convenience stairs between 34,35,36 floor and infill of stair opening with new concrete metal deck floor slab as shown on the plans. No change of egress, occupancy, and use.
No product keyword matched · NYC DOB building permits
Sprinklers · Application being filed for the removal and installation of Sprinkler heads on the 46th and 47th floors. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Fit out of the 20th floor construction/23rd floor marketing with new supply, return, and exhaust ductwork. New AC units, VAV boxes, and exhaust fan as per plans filed herewith. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits