Mechanical Systems · JOB FILED TO REPLACE EXISTING LOBBY SPLIT SYSTEM AIR CONDITIONING UNITS WITH NEW HEAT PUMP AND CEILING MOUNTED AIR CONDITIONER. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Mechanical Systems · JOB FILED TO REPLACE EXISTING LOBBY SPLIT SYSTEM AIR CONDITIONING UNITS WITH NEW HEAT PUMP AND CEILING MOUNTED AIR CONDITIONER. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits